BBMP & GBA Building Plan Sanction Guide Bangalore (2026 Bye-Laws) | Urbanbuild Homes
MUNICIPAL REGULATORY COMPLIANCE · BENGALURU

BBMP & GBA Building Plan Sanction Guide (2026 Bye-Laws & Setbacks)

Navigating Bangalore's building approvals doesn't have to be overwhelming. Here is the definitive guide to Greater Bengaluru Authority (GBA) and BBMP bye-laws, floor area ratio (FAR), mandatory setbacks, fee structures, and turnkey sanction liaisoning.

Typical Residential FAR 1.75 – 2.25
Max Ground Coverage 70% to 75%
Approval Timeline 25 to 35 Days
Sanction Liaisoning 100% In-House UBH
Regulatory Compliance

Why Getting a Valid Building Plan Sanction is Non-Negotiable

With the enactment of the Greater Bengaluru Governance Act and tightened vigilance by civic authorities, building a house without an approved sanction plan or deviating substantially from sanctioned setbacks carries severe risks, including heavy municipal fines, refusal of permanent BESCOM electricity and BWSSB Cauvery water connections, and future legal disputes.

At Urbanbuild Homes, our council-registered architects design every home strictly aligned with Master Plan zoning, maximizing your usable living square footage while ensuring 100% legal compliance and seamless occupancy certification.

Calculate Construction Cost

Mandatory Documents for Plan Sanction:

✓ Updated A-Khata Certificate & Extract: Issued by BBMP/GBA zonal office.
✓ Registered Title Deed & Mother Deed: Establishing clear chain of ownership.
✓ Latest Property Tax Paid Receipt: For current financial year with SAS acknowledgement.
✓ Encumbrance Certificate (EC): Form 15 for minimum 15 to 30 years from Sub-Registrar.
✓ Auto-DCR CAD Blueprint & Structural Stability: Prepared & signed by UBH licensed engineer.
SETBACK STANDARDS

Bangalore Building Bye-Law Setback & Coverage Norms

Standard residential guidelines under the Revised Master Plan (RMP). Setbacks vary slightly based on abutting road width and overall building height.

Plot Dimensions Plot Area Front Setback Rear Setback Side Setbacks Max Ground Coverage Base FAR
30×40 Plot 1,200 sq ft 1.00 m (~3.3 ft) 1.00 m (~3.3 ft) 0.75 m to 1.0 m 75% (~900 sq ft) 1.75
30×50 Plot 1,500 sq ft 1.50 m (~5.0 ft) 1.25 m (~4.1 ft) 1.00 m (~3.3 ft) 70% (~1,050 sq ft) 1.75 – 2.00
40×60 Plot 2,400 sq ft 2.00 m (~6.6 ft) 1.50 m (~5.0 ft) 1.50 m (~5.0 ft) 65% (~1,560 sq ft) 2.00 – 2.25
50×80 Plot 4,000 sq ft 3.00 m (~9.8 ft) 2.00 m (~6.6 ft) 2.00 m (~6.6 ft) 60% (~2,400 sq ft) 2.25

*Note: Corner plots enjoy front setback concessions on secondary roads. Premium FAR may be purchased under government gazette notifications for roads 40 feet or wider.

STEP-BY-STEP WORKFLOW

How Urbanbuild Homes Handles Your Plan Sanction End-to-End

From digital CAD drafting to physical site inspection coordination, our team manages every bureaucratic step so you never have to stand in municipal queues.

STEP 01

Architectural CAD & Auto-DCR Pre-Check

Our licensed architects translate your lifestyle brief into CAD floorplans, sections, elevations, and ensure 100% compliance with Auto-DCR municipal validation software.

STEP 02

Online Portal Submission

We upload the digital drawing package, encumbrance certificates, and title documents to the Karnataka Online Building Plan Approval System (OBPAS).

STEP 03

ADTP / Town Planning Site Inspection

A site engineer from the municipal zonal office visits your plot to verify boundaries, road width, overhead electrical lines, and adjacent plots.

STEP 04

Fee Demand Note & Sanction Issuance

Upon inspection clearance, BBMP generates an official demand note. Following direct payment, the approved blueprinted LP (License & Plan) is issued.

HASSLE-FREE PLAN SANCTION

Build with 100% Peace of Mind in Bengaluru

From BBMP/GBA plan approval to 3D architectural design and turnkey civil construction with daily live CCTV streaming, Urbanbuild Homes delivers your dream home on schedule.

Chat on WhatsApp: +91 89045 45558
WhatsApp Us
💰 Estimate Cost

Ready when you are.

Free architectural consultation — no sales spam, zero obligation.