MY HOME ESTIMATOR™ · GBA 2026 SPECIFICATIONS

Plan Your Construction Budget with Zero Hidden Costs

Calibrated to Greater Bengaluru Authority (GBA) & BBMP building bye-laws. Select your plot size or custom built-up area for an itemised bill of quantities, milestone schedule, and EMI planner.

Bengaluru GBA & BBMP Bye-Laws 2026 Compliant IS 456 & CPWD Construction Rates
30 × 40 1,200 sq ft Plot
30 × 50 1,500 sq ft Plot
40 × 60 2,400 sq ft Plot
50 × 80 4,000 sq ft Plot
Custom Slider Input
1800 sq ft
600 sq ft (Compact) 1800 sq ft (Standard) 5000 sq ft (Luxury)
G + 1 (Duplex)
Ground Only
G + 1 (Duplex)
G + 2 (Triplex)
G + 3 (Stilt+3)
Ground Coverage (70% Max) 1,260 sq ft max
Permissible FAR 1.75 – 2.25 FAR
Mandatory Setbacks Front: 0.9m · Sides: 0.7m
GBA 2026 OC Rule Standard Plan Sanction

Foundation

₹1,450 – ₹1,700/sqft

Comfort

₹1,700 – ₹2,100/sqft

Elevation

₹2,100 – ₹2,700/sqft

Signature

₹2,700 – ₹3,500/sqft

EcoNest

₹1,900 – ₹2,300/sqft
Estimated Turnkey Construction Cost (GBA Compliant)
₹75.60 – ₹97.20 Lakhs
3,600 sq ft total built-up (2 Floors) · ₹2,100 – ₹2,700/sqft

Calculated Bill of Quantities (BOQ)

Estimated raw material quantities computed according to standard IS 456 / CPWD construction norms for Bengaluru ground conditions.

Cement Quantity
1,512 Bags
Ultratech / ACC / Birla Super (53 Grade)
TMT Steel (Fe550D)
14.4 MT
Tata Tiscon / JSW Neosteel
M-Sand & Plastering Sand
6,660 CFT
Double-Washed Premium M-Sand & P-Sand
Concrete Solid Blocks
4,860 Units
APCO / High-Density Solid Blocks (6" & 4")
Interior & Exterior Paints
1,260 Litres
Asian Paints Royale / Apex Ultima
Flooring & Wall Cladding
3,168 Sq Ft
Italian Marble / Premium Vitrified (Kajaria/Simpolo)

Phase-Wise Construction & Payment Milestones

Transparent, zero-advance billing. You only pay upon verified OTP milestone completion on My Home Dashboard™.

01

Mobilization, Soil Testing & Foundation

Site clearance, borewell/water setup, excavation, anti-termite treatment, and footing casting.

15% Share
₹12.96 L
02

RCC Superstructure & Roof Slabs

Column casting, plinth beams, staircase, ground floor & upper floor RCC roof slabs with shuttering.

30% Share
₹25.92 L
03

Masonry, Solid Blockwork & Plastering

External & internal wall brickwork, door frames fixing, conduit cutting, and internal/external sand-face plastering.

20% Share
₹17.28 L
04

Plumbing, Electrical, Flooring & Waterproofing

CPVC piping, concealed wiring, distribution board, bathroom waterproofing, and vitrified/marble tile laying.

20% Share
₹17.28 L
05

Painting, Fixtures, Deep Clean & Handover

Primer & 2 coats premium paint, sanitaryware fixtures, light fittings, snag list resolution, and key handover.

15% Share
₹12.96 L

Home Loan & EMI Financial Planner

Partnered with leading national banks (SBI, HDFC, ICICI, Axis) for hassle-free construction loan approvals and stage-wise disbursements.

₹65.00 Lakhs
20 Years
8.5 %
Estimated Monthly EMI
₹56,419 / mo
At standard bank interest rates
Principal ₹65.00 L
Total Interest ₹70.40 L
Total Payable ₹1.35 Cr
Get Free Loan Assistance

"We don't ask for trust. We give complete confidence."

Book your free architectural consultation and get a tailored line-item BOQ for your site.

Book Free Site Assessment →
💰 Estimate Cost

Ready when you are.

Free, no-obligation consultation — no sales call, no sign-up.

Book Free Consultation